top of page

AP7 FRS SCHEME AT WEETABIX



Progress on the AP7 FRS Scheme at Weetabix is going well. The concrete blind bases are finished as well as steel fabrication for the concrete.


The following week, the second stage of the weighbridge floor slab had been poured, with shuttering panels fabricated and beginning to be put in place.





16 views0 comments

Recent Posts

See All
bottom of page