top of page

Completion of Replacement Pea Drain





KCC has recently finished manhole replacement works within the pea chamber run at Princes Foods in Long Sutton. The project involved carefully removing the existing system, over pumping to maintain production, dewatering, temporary works, installation of the new chamber, backfilling and reinstatement of concrete surfaces.


Working with Kirk Connected construction on our Drainage Replacement Project was stress free from start to finish. Their professionalism, expertise, and dedication to delivering good quality work was evident every step of the way.
From the initial consultation to the completion of the project, Kirks demonstrated a clear understanding of our needs and provided a comprehensive solution tailored to our specific requirements. The removal of the collapsed drainage chamber, reinforcement of the foundation, pipework connection, and restoration of the area was executed flawlessly and within the designated timeline and budget.
Throughout the project, the team at Kirks exhibited a high level of skill and proficiency, ensuring that all tasks were completed promptly, efficiently, and to the highest standard. Their commitment to safety and adherence to best practices ensured that the works were carried out with minimal disruption to the site and surrounding areas.
I have been impressed with the results achieved by Kirk and would highly recommend their services. Thank you for your outstanding work! - Elliot Stones (Group Project Engineer)






6 views0 comments

Recent Posts

See All
bottom of page